Europe has made preparedness a duty. The Preparedness Union Strategy points to the first seventy-two hours. The CER Directive requires designated critical entities to assess their risks, including the dependencies that cross sector boundaries. NIS2 does the same in the digital domain. All three are written entity by entity, and all three do their job. What none of them covers is the place where a blackout, a flood or an evacuation actually plays out: an area, in which entities, residents and dependencies sit on top of one another. Call that missing layer area-level resilience. Three practices from the Netherlands show what it looks like once it is in place.
Failure as the starting point
The Dutch national risk analysis, published in October 2026, dropped critical infrastructure as a threat theme of its own. The reasoning is that other themes describe causes, while the failure of critical services is a consequence. Instead, the consequence was written into all thirty-five scenarios.
That changes the question a city has to answer. The question is no longer which threat to prepare for, but what sits in this area and what depends on what. The answer holds whether the cause is a storm, a cable fault or sabotage.
The same analysis makes the stakes plain. Among Dutch businesses, 64 per cent cannot function the moment the electricity stops. Within a day, 90 per cent are out.
Preparing per threat multiplies the work. Preparing per area concentrates it.
One: how resilient is this area?
Resilience is described more often than it is measured. A resilience scan scores a district on around thirty-five indicators: the make-up of the population, what an area depends on and how quickly help arrives. It then sets that score against every other district in the country. The comparison is what makes the number usable, because a score on its own says little.
The value sits in the criteria rather than in the score. Once the weights are written down, the discussion can be about the weights, which is where it belongs. In Tilburg the scan underpinned the choice of locations where residents can go when power and telecommunications stay down. It can be run again whenever the building stock or the population shifts.
A resilience figure earns its authority from the criteria behind it, not from its decimal places.

Two: what fails, and when?

Preparedness planning tends to rest on fixed time bands that apply to a whole country. Mobile coverage goes within a couple of hours, emergency-services communication at around eight, sewerage at around twelve.
Calculated area by area, the picture changes. Hour by hour across seventy-two hours, the calculation shows which facilities are still on mains power, which are running on backup and which have stopped.
One finding surprises every room. Backup power does not bridge the period it is assumed to bridge. Of the facilities that switch to backup, roughly half have stopped two hours later. After a day, almost all of them have. A calculation like that rests on assumptions, and the assumptions belong in view before the outcome does.
A national average is a planning assumption. An area calculation is a planning basis.
Three: can people move in time?
An incident ignores administrative borders, so the model should too. For one Dutch river area, eight safety regions now share a single evacuation model instead of eight local ones. A run completes in minutes, which makes it something a group can work with during a session rather than a study that is read once.
Movement runs in both directions, and that is the part preparedness planning usually leaves out. The calculation that shows how people leave an area also shows what it costs to reserve a lane for traffic coming in.
The unit of analysis should match the incident, not the organisation chart.

What makes area-level resilience scalable
All three practices run on public information that already exists, so a city can start without a data programme in front of it. Because every area is assessed in the same way, two neighbouring areas see the same thing in the same way, which is the only sound basis for dividing scarce capacity between them. The periodic review, including the regional risk profile, then becomes a recalculation rather than a new project.
The limits worth stating
A calculation does not fill a blind spot. There is no national register of residents who depend on electrically powered care at home, so no model produces that picture on its own. What a shared picture of an area does is show exactly where that conversation belongs, and with whom. Stating the limit is part of the method, because an outcome that hides its gaps will be challenged at the worst possible moment.
What this means for your city
Start with the question your own duty already forces you to answer, and pick the area it lands in. Write down the criteria before you look at any score, because the criteria are what you will defend. Run the first calculation on public information alone, so the starting point is reproducible and the discussion is about the outcome rather than about access to data. Then agree with your neighbours to use the same method, because comparability is what turns a local answer into a regional one.
None of this calls for a new institution. It calls for one shared unit of analysis and the willingness to recalculate.
About this work
Argaleo develops Digitwin, a digital twin platform used daily by Dutch municipalities, safety regions, provinces and national authorities. The practices described here run on it, using nationwide public information, so they work the same way in every area.
Meet us in Barcelona
See these three practices run on your own area
We will be at The Implementation Gap on Monday 2 November and at Smart City Expo World Congress from 3 to 5 November, in the Holland Pavilion, stand B81 in hall 3. Bring a question from your own city or region and we will run it on the spot.




more news
Subscribe to our newsletter and stay up to date with our digital twin innovations!
Europe has made preparedness a duty, but every rule works entity by entity. A blackout happens in an area. Three practices from the Netherlands show what it takes to fill that gap.
Platform Binnenstad Arnhem, BIZ Kernwinkelgebied Arnhem and the municipality are extending their work with Argaleo and adding a property monitor.
Digitwin now shows, for every area in the Netherlands, what happens in the first 72 hours of a prolonged power outage: hour by hour, which facilities are on mains power, which are running on backup power and which have gone down.
DHM and Argaleo calculate the effect of a phasing plan on the surrounding area: diversions per mode of transport, affected addresses, businesses and bus services. Built entirely on open data, with major maintenance on the N231 Zuid as the case.
The Dutch Ministry of Infrastructure and Water Management has published national walkability, cyclability and e-bikeability scores. The method builds on the accessibility scores Argaleo developed with SmartwayZ.NL, Tour de Force and Natuur en Milieu in the Digitwin platform.
Argaleo is the cover story of Regio Business. Jeroen Steenbakkers on building to scale with six people, thinking with clients instead of selling, and the ambition of nationwide coverage.